A Track Record Across Equipment, Chemicals & Steel

We’ve spent more than a decade helping companies overcome the challenges of sourcing from China. Here are some of the projects we’ve delivered for customers around the world.

Seamless Steel Pipes (USD 145,000)

Categories:

Client: New Concept Mining

Product: Seamless Steel Pipes (USD 145,000)

Key Points:

Location: 🇿🇦 | South Africa

Customer Summary & Challenge:

  • Poor quality and long lead times from India
  • No trusted China steel supplier

Outcome:

  • 3 OEMs identified and factory audited
  • 5 rounds of sample testing and quality approval
  • 18% landed cost savings achieved

Caustic Soda 99% (USD 75,000)

Categories:

Client: Crete Tech

Product: Caustic Soda 99% (USD 75,000)

Key Points:

Location: 🇺🇸 | USA

Customer Summary & Challenge:

  • New product launch with no reliable supplier
  • Worried about product quality
  • No experience with China-to-US sourcing

Outcome:

  • Sourced from the same factory supplying our European client 
  • 3 rounds of sample & production-level testing
  • Ongoing container orders delivered to California

Vanadium Processing Technology Project (~$90M)

Categories:

Client: Critical Minerals Group

Product: Vanadium Processing Technology Project (~$90M)

Key Points:

Location: 🇦🇺 | Australia

Customer Summary & Challenge:

  • Needed alternatives to European brands
  • Only aware of one Chinese OEM
  • No visibility on alternative technology and cost savings

Outcome:

  • 30 new manufacturers identified
  • 6 shortlisted and China trip organized
  • ~$2M eliminated during feasibility

Steel Prefabricated Buildings ($3.7m)

Categories:

Client: Oserian

Product: Steel Prefabricated Buildings ($3.7m)

Key Points:

Location: 🇰🇪 | Kenya

Customer Summary & Challenge:

  • Needed multiple facilities delivered quickly — housing, warehouse, and hospital
  • Traditional construction too slow/expensive

Outcome:

  • Verified OEM — quality & pricing confirmed
  • Installation & local team training included
  • Built in under 4 months — 400% faster than traditional construction

Chemical Reagents ($ 95,000)

Categories:

Client: Mopani Copper

Product: Chemical Reagents ($ 95,000)

Key Points:

Location: 🇿🇲 | Zambia

Customer Summary & Challenge:

  • Existing supplier had long delivery times
  • Rising costs reducing margins

Outcome:

  • Identified 2 factories with ready stock
  • Product sourced and shipped to site
  • 35 days faster delivery achieved with cost savings

Gold Processing Plant ($452,000)

Categories:

Client: Regional Gold Mining Company

Product: Gold Processing Plant ($452,000)

Key Points:

Location: 🇹🇿 | Tanzania

Customer Summary & Challenge:

  • Needed full design, not just equipment
  • Needed installation & on-site training

Outcome:

  • 4 OEMs shortlisted and factory visit completed
  • Supplier jointly selected with customer
  • Procurement, installation & support delivered—150 tpd achieved

Steel Split Sets ($125,000)

Categories:

Client: ASX-Listed Miner

Product: Steel Split Sets ($125,000)

Key Points:

Location: 🇦🇺 | Australia

Customer Summary & Challenge:

  • Local middleman was buying from China and adding high markup
  • Real factory was hidden

Outcome:

  • 3 OEMs verified with Australia export experience
  • Direct factory relationship established
  • ~25–30% OPEX savings achieved

Leaching Chemicals ($ 85,000)

Categories:

Client: Grøntvedt Pelagic

Product: Leaching Chemicals ($ 85,000)

Key Points:

Location: 🇳🇴 | Norway

Customer Summary & Challenge:

  • First-time sourcing from China
  • Afraid of receiving bad quality
  • No time to vet factories alone

Outcome:

  • Quality approved via 2 rounds of sampling
  • Replaced European suppliers with 20% cost savings
  • Ongoing quarterly shipments

6000 TPD Full Processing Plant EPC Project (~$350M)

Categories:

Client: Thyssenkrupp Industrial Solutions

Product: 6000 TPD Full Processing Plant EPC Project (~$350M)

Key Points:

Location: 🇩🇪 | Germany

Customer Summary & Challenge:

  • Replace expensive German equipment & steel
  • No verified Chinese EPC/OEM partners

Outcome:

  • 50 EPC/OEM screened, 5 shortlisted
  • 1 EPC partner selected for turnkey delivery 
  • ~25–30% cost savings

Solution Provided by Camal: